{"id":6979,"date":"2020-07-16T09:54:00","date_gmt":"2020-07-16T07:54:00","guid":{"rendered":"http:\/\/www.monitor-bk.cz\/?p=6979"},"modified":"2020-07-15T10:06:51","modified_gmt":"2020-07-15T08:06:51","slug":"jiri-crha-na-projektu-premosteni-na-stare-blansko-stale-pracujeme","status":"publish","type":"post","link":"https:\/\/www.monitor-bk.cz\/?p=6979","title":{"rendered":"Ji\u0159\u00ed Crha: Na projektu p\u0159emost\u011bn\u00ed  na Star\u00e9 Blansko st\u00e1le pracujeme"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"800\" height=\"510\" src=\"https:\/\/www.monitor-bk.cz\/wp-content\/uploads\/2020\/04\/starosta1_web-800x510.jpg\" alt=\"\" class=\"wp-image-6889\" srcset=\"https:\/\/www.monitor-bk.cz\/wp-content\/uploads\/2020\/04\/starosta1_web-800x510.jpg 800w, https:\/\/www.monitor-bk.cz\/wp-content\/uploads\/2020\/04\/starosta1_web-300x191.jpg 300w, https:\/\/www.monitor-bk.cz\/wp-content\/uploads\/2020\/04\/starosta1_web-126x80.jpg 126w, https:\/\/www.monitor-bk.cz\/wp-content\/uploads\/2020\/04\/starosta1_web-768x489.jpg 768w, https:\/\/www.monitor-bk.cz\/wp-content\/uploads\/2020\/04\/starosta1_web.jpg 1276w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<p><strong>\tPane starosto, jak je to aktu\u00e1ln\u011b s pl\u00e1ny na \u201eP\u0159emost\u011bn\u00ed na Star\u00e9 Blansko\u201c? M\u011bn\u00ed se n\u011bco v d\u016fsledku koronaviru?<\/strong><\/p>\n\n\n\n<p>\tDouf\u00e1m, \u017ee nem\u011bn\u00ed. St\u00e1le je to jeden z prioritn\u00edch projekt\u016f m\u011bsta a my intenzivn\u011b pracujeme na jeho p\u0159\u00edprav\u011b. Tento projekt se skl\u00e1d\u00e1 ze t\u0159\u00ed staveb \u2013 jde o vybudov\u00e1n\u00ed samotn\u00e9ho p\u0159emost\u011bn\u00ed nad st\u00e1vaj\u00edc\u00ed trat\u00ed, kter\u00e9 vytvo\u0159\u00ed nov\u00e9 napojen\u00ed na Star\u00e9 Blansko v m\u00edst\u011b b\u00fdval\u00fdch uheln\u00fdch sklad\u016f, druhou stavbou je nov\u00fd bezbari\u00e9rov\u00fd podchod u \u017eelezni\u010dn\u00ed zast\u00e1vky Blansko \u2013 m\u011bsto, sou\u010d\u00e1st\u00ed jsou tak\u00e9 \u00fapravy, kter\u00e9 vyvol\u00e1 uzav\u0159en\u00ed st\u00e1vaj\u00edc\u00edho p\u0159ejezdu v \u017eelezni\u010dn\u00ed zast\u00e1vce. Ten pat\u0159\u00ed mezi nejnebezpe\u010dn\u011bj\u0161\u00ed p\u0159ejezdy v \u010cesk\u00e9 republice, proto chce Spr\u00e1va \u017eeleznic \u00farov\u0148ov\u00e9 k\u0159\u00ed\u017een\u00ed trati zru\u0161it. Uzav\u0159en\u00ed p\u0159ejezdu je dokonce podm\u00ednkou ze strany st\u00e1tu, abychom mohli z\u00edskat dotaci na stavbu samotn\u00e9ho p\u0159emost\u011bn\u00ed. Investorem m\u00e1 b\u00fdt toti\u017e Jihomoravsk\u00fd kraj spole\u010dn\u011b s m\u011bstem.&nbsp;<\/p>\n\n\n\n<p><strong>\tA v jak\u00e9 f\u00e1zi jsou p\u0159\u00edpravy?<\/strong><\/p>\n\n\n\n<p>\tJedn\u00e1n\u00ed t\u00fdkaj\u00edc\u00ed se p\u0159emost\u011bn\u00ed aktu\u00e1ln\u011b st\u00e1le pob\u00edhaj\u00ed. V uplynul\u00fdch t\u00fddnech se n\u00e1m poda\u0159ilo nap\u0159\u00edklad dojednat, \u017ee bezbari\u00e9rov\u00fd podchod kompletn\u011b vybuduje Spr\u00e1va \u017eeleznic, tak\u017ee se nemus\u00edme starat o jeho stavbu, ani o jej\u00ed financov\u00e1n\u00ed. O financov\u00e1n\u00ed nadjezdu budeme \u017e\u00e1dat St\u00e1tn\u00ed fond dopravn\u00ed infrastruktury (SFDI). V sou\u010dasn\u00e9 dob\u011b se zpracov\u00e1v\u00e1 tzv. ekonomick\u00e9 hodnocen\u00ed projektu, kter\u00e9 mus\u00ed b\u00fdt sou\u010d\u00e1st\u00ed \u017e\u00e1dosti. Toto hodnocen\u00ed zpracov\u00e1v\u00e1 projek\u010dn\u00ed firma, hotov\u00e9 by m\u011blo b\u00fdt na p\u0159elomu z\u00e1\u0159\u00ed a \u0159\u00edjna. Je to jeden z nutn\u00fdch podklad\u016f, abychom n\u00e1sledn\u011b mohli podat \u017e\u00e1dost o dotaci.&nbsp;<\/p>\n\n\n\n<p><strong>\tTo bude po krajsk\u00fdch volb\u00e1ch, m\u016f\u017ee v\u00fdsledek voleb n\u011bjak ovlivnit jedn\u00e1n\u00ed s krajem a p\u0159\u00edpravu p\u0159emost\u011bn\u00ed?&nbsp;<\/strong><\/p>\n\n\n\n<p>\tJe pravda, \u017ee z tohoto pohledu budou \u0159\u00edjnov\u00e9 krajsk\u00e9 volby pro na\u0161e m\u011bsto velmi d\u016fle\u017eit\u00e9. \u017d\u00e1dost o financov\u00e1n\u00ed a vlastn\u00ed jedn\u00e1n\u00ed s n\u00e1mi toti\u017e povede nov\u00e1 politick\u00e1 reprezentace kraje, kter\u00e1 vzejde z krajsk\u00fdch voleb. Samoz\u0159ejm\u011b celou z\u00e1le\u017eitost ohledn\u011b financ\u00ed intenzivn\u011b projedn\u00e1v\u00e1me ji\u017e nyn\u00ed a to jak s veden\u00edm kraje, tak s veden\u00edm St\u00e1tn\u00edho fondu dopravn\u00ed infrastruktury i s veden\u00edm Spr\u00e1vy \u017eeleznic. A v\u011b\u0159\u00edme, \u017ee po volb\u00e1ch na tato jedn\u00e1n\u00ed nav\u00e1\u017eeme. Nechceme nic ponechat n\u00e1hod\u011b.<\/p>\n\n\n\n<p><strong>\tV\u011b\u0159\u00edte tedy, \u017ee se poda\u0159\u00ed projekt p\u0159emost\u011bn\u00ed zrealizovat?<\/strong><\/p>\n\n\n\n<p>\tD\u011bl\u00e1me a ud\u011bl\u00e1me maximum pro to, aby se to zvl\u00e1dlo. Doufejme, \u017ee ekonomick\u00e1 recese zp\u016fsoben\u00e1 epidemi\u00ed koronaviru nebude m\u00edt vliv na financov\u00e1n\u00ed takto d\u016fle\u017eit\u00fdch projekt\u016f. My na p\u0159\u00edprav\u011b pracujeme a s realizac\u00ed po\u010d\u00edt\u00e1me. Nen\u00ed mo\u017en\u00e9 si p\u0159\u00edli\u0161 ur\u010dovat, kdy stavbu p\u0159emost\u011bn\u00ed zrealizovat, v\u0161e se mus\u00ed skloubit s vlakovou v\u00fdlukou na trati, kterou pl\u00e1nuj\u00ed \u010cesk\u00e9 dr\u00e1hy. Proto je kl\u00ed\u010dov\u00e9 na p\u0159\u00edprav\u00e1ch pracovat. U\u017e je vyd\u00e1no \u00fazemn\u00ed rozhodnut\u00ed, nyn\u00ed se zpracov\u00e1v\u00e1 projekt pro stavebn\u00ed povolen\u00ed, kter\u00e9 by mohlo b\u00fdt vyd\u00e1no do konce leto\u0161n\u00edho roku. M\u00e1me u\u017e smluvn\u011b vy\u0159e\u0161en\u00e9 i p\u0159evody v\u0161ech pozemk\u016f. Posledn\u00ed \u00fapravy, kter\u00e9 bylo pot\u0159eba chv\u00e1lit z d\u016fvodu zm\u011bny v technick\u00e9m \u0159e\u0161en\u00ed, proto\u017ee se p\u016fvodn\u011b pl\u00e1novan\u00e1 pr\u016fse\u010dn\u00e1 k\u0159i\u017eovatka ulic Svitavsk\u00e1 a Fugnerova oproti p\u016fvodn\u00edm pl\u00e1n\u016fm zm\u011bnila na okru\u017en\u00ed, schv\u00e1lilo \u010dervnov\u00e9 zastupitelstvo. Pokud bude schv\u00e1lena dotace, tak stavbu lze realizovat.<\/p>\n\n\n\n<p><strong>\tJak\u00fd by tedy mohl b\u00fdt \u010dasov\u00fd horizont?<\/strong><\/p>\n\n\n\n<p>\tV\u011b\u0159\u00edme, \u017ee se poda\u0159\u00ed v\u0161e tak, aby byl za\u010d\u00e1tek stavby p\u0159emost\u011bn\u00ed na podzim roku 2021, jej\u00ed dokon\u010den\u00ed do konce roku 2022. Po dokon\u010den\u00ed p\u0159emost\u011bn\u00ed za\u010dnou pr\u00e1ce na nov\u00e9m bezbari\u00e9rov\u00e9m podchodu ve stanici Blansko-m\u011bsto. Po jeho dokon\u010den\u00ed se za\u010dne pracovat na uzav\u0159en\u00ed st\u00e1vaj\u00edc\u00edho p\u0159ejezdu na Star\u00e9 Blansko.&nbsp;<\/p>\n\n\n\n<p><strong>\tPosledn\u00ed nepracovn\u00ed dotaz, jak pl\u00e1nujete str\u00e1vit leto\u0161n\u00ed l\u00e9to?<\/strong><\/p>\n\n\n\n<p>\tV pl\u00e1nu m\u00e1m pr\u00e1ci ale samoz\u0159ejm\u011b tak\u00e9 odpo\u010dinek. Zahrani\u010dn\u00ed dovolenou ale letos nepl\u00e1nuji. Chyst\u00e1me se vyrazit do Beskyd a tak\u00e9 do Jesen\u00edk\u016f, poka\u017ed\u00e9 ale na n\u011bjak\u00fd krat\u0161\u00ed pobyt, prodlou\u017een\u00fd v\u00edkend. R\u00e1di bychom se tak\u00e9 pod\u00edvali na Slovensko, odkud poch\u00e1z\u00ed rodina m\u00e9ho zet\u011b. Pl\u00e1nujeme sp\u00ed\u0161e n\u011bjakou aktivn\u00ed dovolenou, t\u011b\u0161\u00edm se. R\u00e1d bych pop\u0159\u00e1l tak\u00e9 v\u0161em \u010dten\u00e1\u0159\u016fm Monitoru, aby str\u00e1vili p\u0159\u00edjemn\u00e9 l\u00e9to a po uplynul\u00fdch m\u011bs\u00edc\u00edch si hlavn\u011b odpo\u010dinuli, aby si u\u017eili sv\u00e9 bl\u00edzk\u00e9 a na\u010derpali dostatek energie do zbytku roku.<\/p>\n\n\n\n<p><strong>-r-<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pane starosto, jak je to aktu\u00e1ln\u011b s pl\u00e1ny na \u201eP\u0159emost\u011bn\u00ed na Star\u00e9 Blansko\u201c? M\u011bn\u00ed se n\u011bco v d\u016fsledku koronaviru? Douf\u00e1m,<\/p>\n","protected":false},"author":1,"featured_media":6889,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[55],"tags":[],"_links":{"self":[{"href":"https:\/\/www.monitor-bk.cz\/index.php?rest_route=\/wp\/v2\/posts\/6979"}],"collection":[{"href":"https:\/\/www.monitor-bk.cz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.monitor-bk.cz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.monitor-bk.cz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.monitor-bk.cz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6979"}],"version-history":[{"count":1,"href":"https:\/\/www.monitor-bk.cz\/index.php?rest_route=\/wp\/v2\/posts\/6979\/revisions"}],"predecessor-version":[{"id":6980,"href":"https:\/\/www.monitor-bk.cz\/index.php?rest_route=\/wp\/v2\/posts\/6979\/revisions\/6980"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.monitor-bk.cz\/index.php?rest_route=\/wp\/v2\/media\/6889"}],"wp:attachment":[{"href":"https:\/\/www.monitor-bk.cz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6979"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.monitor-bk.cz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6979"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.monitor-bk.cz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6979"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}